Due to additional conditions identified after the original scope, extend the existing under-slab tunnel and piping by approximately 25 additional feet, bringing the total tunnel length to approximately 35 feet. The work includes continued excavation beneath the home, removal of the affected piping, and installation of new piping with all necessary fittings and connections. Once the piping repair is completed, the system will be tested to verify proper operation and confirm there are no leaks. The tunnel will then be backfilled and compacted upon completion of the plumbing work.